Wednesday, February 10, 2016

lights, water, action

Ash Wednesday 2016

As carnaval comes to an end on a beautiful summer day - we have some nice updates as we gain some momentum again in Brejal.  One of the biggest changes relates to electricity - we installed a small solar system which is working but limited and also bought a used generator that can make up for the difference as needed.  The generator is in the shop at the moment but hopefully we'll have it next week.  We also had a well dug which should resolve all our water needs.  We do need to run a pump but if the it can't run off the solar energy we can do it off the generator which will fill a larger tank which will give us pressure.  On the building front, we have built a small enclosure for a composting toilet set-up and we're in the process of installing a finished floor in the cabin.  After a lot of rain a few weeks back, we were getting bogged down in mud - so we got some landscapping stones and are making some walkways and steps.  Regina is planting lots more ornamental plants and we will get a new load of seedling for fruit tress and such once we get the new water system up and running.
Here are pictures of some of the above
The beans here were grown on our land - although various critters got the lion's share of the crop
corn, cassava and more beans are on the way
 Waters were vary high on our creek after about 8 straight days of rain- normally it's under a yard waide
 Solar panels
 You can just make out installed panels on roof
 Lights on inside
 Interior components
 Beginning of our well
 beginnnings of outhouse
 Finished outbuilding
 Flooring to be installed
 small storage area behind outhouse
 pavers



Healthy disregard for international intellectual property rights
flooring going down